We actually read these.
Ideas submitted here go to the product team, not into a void. Add yours, vote on others, and comment on what matters to your business.
Talk to our Product Managers live: every other Monday, 1:00–2:00 PM ET → https://www.d-tools.com/cloud-product-office-hours
Bulk Technician Drawing Visibility Management
Feature Idea
Add a global visibility control that allows users to instantly make all drawings visible to field technicians with a single action, eliminating the need to manually enable visibility on each drawing individually.
Expanded Feature Description
Overview
In the current workflow, users must manually:
Open each drawing
Click the visibility “eye” icon
Repeat the process one drawing at a time
to allow field technicians access to project drawings.
This process becomes increasingly inefficient on projects containing:
Multiple floorplans
Rack elevations
Wiring diagrams
As-built sheets
Plan views
System layouts
Installation details
For larger projects, this repetitive administrative work creates:
Significant time overhead
Increased risk of missed drawings
Inconsistent technician access
Frustration during project setup
This feature introduces:
Centralized bulk visibility management for technician-facing drawings.
allowing users to manage field access at the:
Project level
instead of
Individual drawing level.
Core Capabilities
“Show All Drawings to Technicians” Global Toggle
Capability
Provide a single button or toggle that enables technician visibility for all drawings in a project.
Expanded Description
Users should be able to:
Instantly enable all drawings for technicians
Instantly hide all drawings if needed
Apply visibility permissions across the entire project in one action
Example actions:
“Enable All for Technicians”
“Show All Drawings”
“Grant Technician Access to All Drawings”
Benefits
Massive reduction in repetitive clicks
Faster project setup
Better technician onboarding
Improved operational efficiency
Strategic Value
Transforms visibility management from:
“manual per-drawing administration”
into:
“project-wide access control.”
Bulk Drawing Permission Management
Capability
Allow users to apply visibility settings to multiple drawings simultaneously.
Expanded Description
In addition to a global toggle, users should be able to:
Multi-select drawings
Bulk-enable visibility
Bulk-disable visibility
Apply permissions by category or type
Example:
Select All Plan Views → Make Visible
or:
Select Rack Drawings → Hide from Technicians
Benefits
More flexible workflow control
Faster permission management
Better scalability on large projects
Technician Access Presets
Capability
Allow users to create saved visibility presets for different project phases or technician groups.
Expanded Description
Different project stages may require different drawing access.
Example presets:
Preset |
Visible Drawings |
Prewire |
Cable plans only |
Installation |
Rack + floor plans |
Commissioning |
Full documentation |
Service |
As-built drawings only |
Users could switch between presets instantly.
Benefits
Faster workflow transitions
Better field coordination
Reduced setup repetition
Role-Based Drawing Visibility
Capability
Allow drawing visibility to be managed by technician role or permission group.
Expanded Description
Different users may require different levels of access:
Role |
Required Drawings |
Installers |
Installation layouts |
Service Techs |
As-builts + schematics |
PMs |
Full project access |
Clients |
Limited presentation drawings |
The system should support:
Role-based visibility
Group permissions
Department-based access
Benefits
Better security
Cleaner collaboration
Easier enterprise management
Centralized Drawing Visibility Dashboard
Capability
Provide a unified interface for managing technician visibility across all project drawings.
Expanded Description
Users should be able to see:
All drawings in one list
Current technician visibility state
Visibility filters
Bulk actions
Access summaries
Possible indicators:
Drawing |
Technician Visible |
Level 1 AV Plan |
✔ |
Rack Elevation A |
✔ |
Security Camera Plan |
✖ |
Benefits
Better visibility management
Easier auditing
Reduced mistakes
Improved usability
Default Visibility Rules for New Drawings
Capability
Automatically apply technician visibility rules to newly created drawings.
Expanded Description
Users should be able to configure:
Automatically visible to technicians
Hidden by default
Visibility inherited from project settings
Example:
New Plan Views → Automatically visible to field team
Benefits
Reduced manual administration
Better consistency
Faster project maintenance
Project-Wide Field Readiness Mode
Capability
Allow projects to be quickly transitioned into a “field-ready” state.
Expanded Description
A project-level action could:
Enable all technician-visible drawings
Publish current revisions
Lock approved sheets
Push updates to field devices
Example:
Publish Project to Field Team
Benefits
Faster deployment preparation
Better operational coordination
Reduced publishing mistakes
Strategic Value
Moves the platform toward:
“field operations workflow management.”
Visibility Filtering by Drawing Type
Capability
Allow users to bulk-manage visibility by drawing category.
Expanded Description
Users could filter and manage:
Plan Views
Rack Elevations
Schematics
Wiring Diagrams
As-Builts
Example:
Show all Rack Elevations to technicians
Benefits
Better organization
Faster permission workflows
Improved scalability
Mobile & Field Synchronization Improvements
Capability
Ensure visibility updates propagate quickly to technician-facing devices and mobile apps.
Expanded Description
Once drawings are enabled:
Technicians should immediately see them
Mobile apps should synchronize automatically
Offline caches should refresh appropriately
Benefits
Faster field access
Better technician experience
Improved real-time coordination
Reduced Administrative Overhead
Capability
Eliminate repetitive drawing-by-drawing permission management.
Expanded Description
The current workflow creates unnecessary operational friction:
Open drawing → Click eye → Repeat dozens of times
This feature centralizes and automates that process.
Benefits
Faster project preparation
Reduced user frustration
Improved efficiency
Better scalability
Enterprise-Scale Project Support
Capability
Improve drawing visibility management for large commercial projects.
Expanded Description
Enterprise projects may contain:
Hundreds of drawings
Multiple disciplines
Multiple installation teams
Phased rollouts
Manual visibility management becomes operationally unsustainable at scale.
Bulk visibility tools create:
Scalable permission management
Cleaner administration
Easier coordination
Benefits
Better enterprise usability
Improved project maintainability
Reduced cognitive overhead
Improved Technician Workflow Experience
Capability
Ensure technicians consistently receive the correct project documentation.
Expanded Description
Field technicians should not struggle because:
Required drawings were forgotten
Visibility settings were missed
Permissions were inconsistent
This feature improves:
Documentation availability
Installation readiness
Field confidence
Benefits
Reduced support calls
Faster installations
Better field coordination
Fewer workflow interruptions
Visibility Audit & Validation Tools
Capability
Allow users to validate which drawings are visible to technicians before publishing.
Expanded Description
The system could provide:
Visibility summaries
Missing drawing warnings
“Technician View” previews
Publish validation checks
Benefits
Better QA/QC
Reduced publishing errors
Improved project readiness
Workflow Automation & Publishing Framework
Capability
Use bulk visibility controls as part of a broader document publishing workflow.
Expanded Description
This feature could evolve into:
Document publishing workflows
Approval gates
Revision publishing
Field distribution automation
Example future workflow:
Approve → Publish → Make Visible to Field Team
Strategic Value
Transforms visibility management into:
“controlled document distribution.”
Unified Drawing Access Management Framework
Capability
Create a centralized system governing drawing visibility, permissions, and publishing workflows.
Expanded Description
Drawing visibility is part of a broader need for:
Permission management
Role-based access
Publishing workflows
Revision control
Technician document distribution
A unified framework could support:
Bulk permissions
Access auditing
Workflow automation
Team-specific publishing
Strategic Value
Transforms the platform from:
“manual drawing sharing”
into:
“a scalable project documentation distribution system.”
Summary of Core Product Value
These capabilities collectively create:
A scalable and efficient technician drawing access management system.
The feature set enables:
One-click visibility for all drawings
Bulk permission management
Technician access presets
Role-based visibility
Project-wide publishing workflows
Reduced administrative effort
Better field coordination
Enterprise-scale usability
Most importantly, it closes the workflow gap between:
“manual per-drawing visibility management”
and
“centralized project-level document distribution for field teams.”